Thursday, 29 March 2012

Week 10

Title of the project:  Run the project

Objective:
  • To ensure the circuit is working properly when combined with hardware part
  • To study about wiring / connection output circuit with AC load and AC power supply

Content/Procedure:
  • Check the connection overall circuit with AC load and AC power supply
  • Turn On the switch and run the project

Connection overall circuit with AC load and AC power supply
  • In this part, correctly wiring is important. Neutral wire for AC load and neutral wire for AC power supply is connect with output circuit

    Run the project


    Analysis:

    For the analysis in this task, the important note is how connection the output circuits with AC load and AC power supply. If wrong connection the circuit probably the component burn and if the projector touch the circuit, it feel some electric shock so to avoid this thing, exact connection must be applied.

    Conclusion:

    As a conclusion, the project is working properly when the overall part is connected and full of the expected. So, this objective is achieved.

    No comments:

    Post a Comment